OZEV grant eligibility checker UK 2026

Check which current residential EV chargepoint grant may fit your circumstances. This checker covers the renters or flat owners grant and the households with on-street parking grant.

Reviewed 2 September 2026. Current residential grants can cover 75% of eligible chargepoint purchase and installation costs, up to a maximum of £500 for one socket. Funding is currently confirmed until 31 March 2027. Always confirm the current rules on GOV.UK before applying.
Renters or flat owners
Up to £500
For people who own and live in a flat, or rent and live in a residential property, and have private off-street parking. An owner-occupier of an ordinary house cannot use this grant.
Households with on-street parking
Up to £500
For people who own or rent their home, do not have private off-street parking, and will install an approved permanent cross-pavement charging solution with the required permissions.
Answer these questions to check the main eligibility criteria
Each question allows one answer. Your earlier answers will remain highlighted while you continue. This provides an indicative result only — OZEV makes the formal eligibility decision.
1. Do you own, lease, use as an eligible company vehicle, or currently have on order an OZEV-eligible electric vehicle?
The vehicle must meet the current OZEV vehicle requirements.
2. Which best describes your home?
3. What parking do you have at this home?
Private off-street parking can include a driveway, garage or clearly defined private parking space that you have the legal right to use.
4. Has the chargepoint already been installed?
These grants cannot normally be backdated. Installation should wait until OZEV confirms eligibility.
5. Have you already received a residential OZEV chargepoint grant for this residence, including an earlier EVHS or Domestic Recharge Scheme grant?
6. Do you have the permissions needed for the installation?
Depending on your circumstances this may include landlord, freeholder, managing-agent, highways-authority, planning or other third-party permission.
7. Are you planning a permanent cross-pavement charging solution such as an approved cable channel or gully?
This question only appears for on-street parking. Temporary cable covers or mats do not meet the grant requirement.

UK EV chargepoint grants 2026 — what is available?

From 1 April 2026, the maximum support available under the main residential OZEV chargepoint grants increased to £500 per eligible socket. The grants can cover 75% of eligible chargepoint purchase and installation costs, subject to the £500 maximum.

Funding for the current home chargepoint grants is confirmed until 31 March 2027. This checker focuses on the two grants aimed directly at people installing a chargepoint at the home where they live: renters or flat owners, and households with on-street parking.

Important: owning a house with a driveway does not make you eligible for the renters or flat owners grant. That grant is for people who own and live in a flat, or rent and live in a residential property, and have private off-street parking.

The two resident grants at a glance

Grant Who it is for Maximum Main parking requirement
Renters or flat owners People who own and live in a flat, or rent and live in a residential property 75% of eligible cost, up to £500 Private, clearly defined off-street parking that the applicant owns or has the legal right to use
Households with on-street parking People who own or rent the home where they live and do not have private and exclusive off-street parking 75% of eligible cost, up to £500 Adequate on-street parking plus an approved permanent cross-pavement charging solution

Renters or flat owners grant

You can potentially use this grant if you either own and live in a flat, including an eligible shared-ownership flat, or rent and live in a residential property. Your home must have its own private off-street parking space and you must own or use an eligible electric vehicle.

The parking space must be off-street, private and clearly defined, accessible to you, and either owned by you or one that you have the legal right to use. You must also have proof of the necessary legal rights and permissions.

Owner-occupiers of ordinary houses: if you own and live in a house, you cannot use the renters or flat owners grant simply because you have a driveway or garage. An exception can apply where a house has been converted into flats and you own and live in one of those flats.

Households with on-street parking grant

This grant is for people who own or rent the home where they live but do not have private and exclusive access to off-street parking. You must have suitable on-street parking and install a permanent cross-pavement charging solution alongside the chargepoint.

A temporary cable mat or removable cable cover does not meet the requirement. You need consent from the relevant local highways authority for the cross-pavement installation and must obtain any planning or third-party permissions that apply.

The grant does not give you ownership of, or a reserved right to, the parking space outside your home.

Who should check their circumstances manually?

A manual check is sensible if your property, parking rights, vehicle arrangement or previous grant history is unusual.

Eligibility can be affected if you have already received an OZEV, EVHS or Domestic Recharge Scheme grant, the chargepoint has already been installed, the installation is required by law, or your property arrangement does not fit the normal resident categories.

Landlords also have a separate residential landlord chargepoint grant. A landlord should use that scheme rather than the resident checker above.

How do you apply in 2026?

The application process is important because the customer now takes an active role. Do not allow installation work to begin before OZEV confirms that you are eligible.

  1. Check that your vehicle and proposed chargepoint meet the current OZEV requirements.
  2. Contact an OZEV-authorised installer and obtain a dated quote.
  3. Obtain the property, parking, landlord, freeholder, highways, planning or other permissions required for your particular installation.
  4. Complete the customer grant application online and provide the requested documents.
  5. Wait until OZEV confirms that you are eligible before installation work starts.
  6. Once the approved installation is complete, your installer submits the grant claim.
  7. If the claim is approved, OZEV pays the grant to the installer. The installer accounts for the grant in the amount charged to you.

How much could you pay after the grant?

The grant covers 75% of eligible chargepoint purchase and installation costs, but only up to £500. This means the amount you pay depends on the eligible quoted cost and on any additional work that is not covered by the grant.

For example, if the eligible cost were £600, 75% would be £450, so the grant could be £450 and the remaining eligible cost would be £150.

If the eligible cost were £800, 75% would be £600, but the grant is capped at £500, leaving £300 of the eligible cost before any additional work or charges.

What changed on 1 April 2026?

The maximum grant available to residents increased from £350 to £500 per eligible socket and the relevant home grant schemes were extended to 31 March 2027. The flats and renters grant also moved to a customer application process.

These changes do not mean that every homeowner can receive £500. Each grant still has its own property, parking, vehicle, permission and application requirements.

Check the official rules before applying
This page is an independent eligibility guide. OZEV makes the formal decision and government grant rules can change.

Frequently asked questions

How much is the OZEV home chargepoint grant in 2026?

For eligible applications from 1 April 2026, the main residential chargepoint grants can cover 75% of eligible chargepoint purchase and installation costs, up to a maximum of £500 for one socket for a resident applicant. The £500 figure is a maximum rather than a guaranteed payment.

Can flat owners get an EV chargepoint grant?

Yes, if you own and live in the flat and meet the other eligibility conditions. You need private off-street parking that you own or have the legal right to use, an eligible vehicle and all relevant permissions.

Can a homeowner with a driveway get the OZEV grant?

Not under the renters or flat owners grant simply because the homeowner has off-street parking. If you own and live in an ordinary house, that grant excludes you. The current on-street parking grant is also not available if you have private and exclusive access to off-street parking.

Can renters get the OZEV chargepoint grant?

Yes. Someone who rents and lives in a residential property can potentially use the renters or flat owners grant if they have suitable private off-street parking, an eligible vehicle and the necessary permissions.

Can social housing or council tenants apply?

Social housing should not be treated as an automatic disqualification simply because of the landlord type. A resident who rents their home should check the normal renter eligibility conditions and obtain the necessary permissions. Registered providers of social housing may also have access to the separate residential landlord grant.

Can I get a grant if I only have on-street parking?

Potentially. The households with on-street parking grant is for people who own or rent the home where they live and do not have private and exclusive off-street parking. You need a permanent cross-pavement charging solution, local highways-authority consent, an eligible vehicle and any other permissions that apply.

Does a cable mat qualify for the on-street parking grant?

No. The cross-pavement solution must be permanent. Temporary cable covers or mats placed over a charging cable do not meet the current grant requirement.

Do I apply for the OZEV grant myself?

Yes. Under the current process you first obtain a quote from an OZEV-authorised installer and gather the required permissions and documents. You then complete the customer application online. Installation should only begin after OZEV confirms that you are eligible. Once the work is complete, the installer submits the grant claim.

Can I install the charger first and claim the grant afterwards?

No. These grants cannot normally be backdated. The chargepoint should not be installed before OZEV has confirmed your eligibility and authorised the installation to proceed.

Do I need an OZEV-approved installer?

Yes. The grant installation must be completed by an OZEV-authorised installer and the chargepoint itself must meet the applicable grant requirements. Check the current official lists before agreeing to the work.

How long are the current grants available?

Funding is currently confirmed until 31 March 2027. Government grant schemes can change, so check the current GOV.UK guidance before arranging an installation.

What if I am a landlord rather than the resident?

Residential landlords have a separate OZEV chargepoint grant. Eligible landlords should use the landlord scheme rather than the resident eligibility checker above.

UK EV chargepoint grants 2026 — what’s available?

Both schemes cover 75% of the combined cost of buying and installing an approved EV charger, up to a maximum of £500. The grant is applied by your installer — you do not apply to OZEV directly.

The two residential grant schemes at a glance

SchemeWho it’s forGrant amountKey requirement
Scheme 1
Off-street parking
Homeowners, flat owners, private renters in any residential property Up to £500
(75% of cost)
Must have dedicated off-street parking. Renters and flat owners need landlord/freeholder permission.
Scheme 2
On-street parking
Homeowners and renters without a driveway or garage Up to £500
(75% of cost)
Must be installing a cross-pavement solution (e.g. charging gully). Requires local council approval.

Who is eligible and who is not

✓ Eligible
Homeowners with off-street parking
Flat owners (with freeholder permission)
Private renters in any property type
On-street only — via Scheme 2
First-time applicants at this address
BEV and PHEV owners
❌ Not eligible
People without a qualifying EV or PHEV
Social housing / council tenants
Previous claimants at same address
Non-standard dwellings (mobile homes etc.)
Standard non-plug-in hybrid owners

How much does a home EV charger cost after the grant?

A typical 7 kW smart home wallbox costs between £800 and £1,200 fully installed before the grant. After the £500 OZEV grant (75% of cost, up to £500), most homeowners pay between £300 and £700 for a quality smart charger installed by an approved company. The grant significantly reduces the upfront cost and most installations pay for themselves within 12–18 months through reduced public charging costs.

What changed on 1 April 2026?

The main changes from 1 April 2026 were: the grant amount increased from £350 to £500; flat owners were added to the eligible group under Scheme 1; a new Scheme 2 was introduced for households with on-street parking only; and all schemes were extended until 31 March 2027. The workplace and landlord grants also increased to £500 per socket.

Frequently asked questions

How much is the OZEV home charger grant in 2026?

From 1 April 2026, both residential OZEV chargepoint grant schemes offer up to £500, covering 75% of the combined cost of buying and installing an approved EV charger. This increased from £350 under the previous scheme. The grants are available until 31 March 2027.

Can flat owners get the EV charger grant?

Yes — from April 2026, flat owners who live in their flat can apply for the Scheme 1 grant (up to £500), provided they have dedicated off-street parking and permission from their freeholder or building management company. This is a significant change from the previous scheme, which largely excluded flat owners.

Can I get the grant if I only have on-street parking?

Yes — there is now a dedicated Scheme 2 grant for households without off-street parking. It covers up to £500 towards a cross-pavement charging solution such as a charging gully installed in the pavement outside your property. This requires local council approval and an OZEV-approved installer experienced in on-street solutions.

Can renters get the OZEV grant?

Yes — private renters in any residential property type (houses, flats, apartments) can apply for the Scheme 1 grant, provided they have dedicated off-street parking and written permission from their landlord. Social housing and council tenants are not eligible for the standard residential grants.

Do I need to apply for the grant myself?

No — your OZEV-approved installer handles the grant application on your behalf. The £500 is deducted from your invoice automatically. You simply choose an approved installer and approved charger, and pay the reduced amount. You do not need to contact OZEV directly.

How long is the grant available for?

The updated grant schemes run until 31 March 2027. OZEV has stated this is a final year extension — it is not guaranteed that the grants will be renewed beyond this date. If you are considering installing a home charger, applying before March 2027 ensures you can access the current funding.

Which EV chargers qualify for the OZEV grant?

Only chargers on the OZEV approved product list qualify. Most major UK home charger brands are approved, including Pod Point, Ohme, Hypervolt, Zappi (myenergi), and Wallbox. Your installer will confirm which models qualify — always use an OZEV-approved installer to ensure the grant is applied correctly.